18 June 2022 - 24 June 2022

Table of Contents

1. MIT OCW

1.1. 18.02 - Multiple Variable Calculus

1.1.1. Session 67-68

1.2. 8.01X+8.01L - Physics I - Classical Mechanics with Labs

1.2.1. Started Problem Set 2

1.2.2. Planning experiment to measure 'g'

1.3. 21G.701 Spanish

1.3.1. Finished Episodes 30-31 (no progress this week)

2. Emergency Crystal Radio

2.1. Have inductor selector - needs desoldering

3. POM 3D print

3.1. fixed side holes in design

3.2. initial POM config problematic - poor build platform adhesion

4. Mill Controller #2

4.1. Try PXE install of CentOS 6.10

5. OLPC

5.1. Needs ML1120 coin batteries to fix "invalid system date".

6. Virtual Orchestra

6.1. sfz file tests

6.1.1. Fixed handful of render-sample bugs

6.1.2. "Test Drive" Mixdown with ecasound complete

7. Measure D analysis

7.1. Completed initial precinct map for Santa Cruz Measure D voting.

7.2. County released precinct data appears incomplete.

8. GAC

8.1. Fixed some math errors. More to go.

9. Intel i5

9.1. Still looking for a suitable motherboard and system.

10. David Davies

10.1. Broadcom BCG? Employee indicted for running a brothel.

10.2. New case C1923172, consolidated with 15 Parties.

10.3. Next hearing 9/6/2022

11. Peter Kim

11.1. Broadcom CSG Employee indicted for trade secret theft.

11.2. United States v. Kim (5:21-cr-00438).

11.3. Change of Plea Hearing Held 5/10/2022 (Guilty on various counts)

11.4. Sentencing 9/20/2022

Author: Daniel Kelley

Created: 2023-10-28 Sat 04:38

Validate