28 May 2022 - 03 June 2022
Table of Contents
1. MIT OCW
1.1. 18.02 - Multiple Variable Calculus
1.1.1. PS8
1.2. 8.01X+8.01L - Physics I - Classical Mechanics with Labs
1.2.1. Started Problem Set 2
1.2.2. Planning experiment to measure 'g'
1.3. 21G.701 Spanish
1.3.1. Finished Episodes 30-31 (no progress this week)
2. Sekar Kembar Gong Hooks (done)
3. Hospice Quilt Top Layout
Started program to verify layout constraints
4. BWMSE
Added more stuff.
5. Golang
Investigating…
6. Mom's Antique Chair
Glued up and reassembled.
7. Emergency Crystal Radio
7.1. Front panel drilled out.
7.2. Inductor selector switch wrong. Need to find a correct switch.
8. POM 3D print
Using "Type T" rpi0w pallet to test POM filament. Need to fix hole depth on side holes.
9. Mill Controller #2
9.1. Potential for using old Compaq iPaq boards.
9.2. May use OLPC in the meantime.
9.3. Still having problems with mill controller booting reliably.
9.4. Cleaned out controller
9.5. Have RTC batteries - need to replace
10. OLPC
10.1. Needs ML1120 coin batteries to fix "invalid system date".
11. Virtual Orchestra
11.1. sfz file tests
SFZ Generation started.
12. Azure
Investigated using Azure to host images for github testing. Seems to be difficult to determine (and cap!) costs.
13. GAC
Fixed some math errors. More to go.
14. Intel i5
Still looking for a suitable motherboard and system. Reminds me why this is one of my least favorite activities.