09 April 2022 - 15 April 2022

Table of Contents

1. MIT OCW

1.1. 18.02 - Multiple Variable Calculus

1.1.1. Session 47-50

1.2. 8.01X+8.01L - Physics I - Classical Mechanics with Labs

1.2.1. Started Problem Set 2

1.2.2. Planning experiment to measure 'g'

1.3. 21G.701 Spanish

1.3.1. Finished Episodes 27-29

2. Mill Controller #2

2.1. Potential for using old Compaq iPaq boards.

2.2. May use OLPC in the meantime.

2.3. Still having problems with mill controller booting reliably.

Needs a new RTC battery.

3. OLPC

3.1. Needs ML1120 coin batteries to fix "invalid system date".

4. Virtual Orchestra

4.1. Continued Bolero coding

4.2. Have strategy for large instruments sets

Generate audio for each instrument separately and generate mix scripe for some DAW TBD.

5. Quilting Frame Desk

5.1. Used Porter-Cable biscuit joiner to recut slots

5.2. Tapped holes in leg brackets

5.3. Started leg brace design

Still don't have final approach.

6. David Davies

6.1. Broadcom BCG? Employee indicted for running a brothel.

6.2. New case C1923172, consolidated with 15 Parties.

6.3. Next hearing 4/29/2022.

7. Peter Kim

7.1. Broadcom CSG Employee indicted for trade secret theft.

7.2. United States v. Kim (5:21-cr-00438).

7.3. Change of Plea Hearing set for 5/31/2022

Author: Daniel Kelley

Created: 2023-10-28 Sat 04:38

Validate