12 June 2021 - 18 June 2021
Table of Contents
The Great California Reopening - I guess
1. Santa Cruz Weather Station
Designed smaller shelter for particle monitor. Complications arising from PMS5003 requirement to have inlet and exhaust airflow separated.
Replacement sensors checked, boards cleaned.
Printed gas vent shelter connector bracket.
1.1. Next step
1.1.1. Check part assemblies
Freecad/Step
1.1.2. Print parts
2. Swocer
Added STEP file generation (support for SCZWS assembly checks)
3. Linux Audio
3.1. Faust programming
3.1.1. Analog Synthesizer modules
Waveshaper, Frequency Shifter, Karplus-Strong Plucked String
3.2. Next Steps
3.2.1. GAC Patch save/restore
3.2.2. LV2 autopatcher
Exploratory tool to generate (was pd, ecasound, now carla) patch for arbitrary LV2 plugin: hook up audio inputs to signal source, audio outputs to speakers, control inputs to control surface, etc.
3.2.3. OSC control surface
Some sort of GUI tool (knob/slider) to OSC messages. This may be as simple as a Faust UI program.
3.2.4. Faust/csound
See if a faust generated unit works.
4. EPICS
4.1. Next steps
4.1.1. u3scpi network port testing
4.1.2. initial EPICS interface
4.1.3. u3scpi analog/digital port reconfiguration.
5. Brini Tracker II
Still working!
5.1. Next steps
5.1.1. Validate remaining standard GPS messages
5.1.2. Investigate GPS chipset data logging
5.1.3. Investigate LoRA radio interface
6. wktcolor
6.1. Next steps
6.1.1. Explore how to get a minimal coloring
Need a specific planar graph four coloring.
7. wktplot
7.1. Next steps
Understand why -r doesn't solve the wktvor/wktdel "sliver at edge" problem.
8. ca-r
8.1. Next Step
None, but expecting ca-tier to break now that the tier system is deprecated.
9. AMDGPU
9.1. Next step
9.1.1. Reverse engineer HSAKMT programming.
10. Ninja v Make
10.1. Next Step
10.1.1. clean simple measurements
11. GMP Forth
Need to think about adding floating point support