03 July 2021 - 09 July 2021
Table of Contents
Quiet Forth of July
1. Santa Cruz Weather Station
Most Particle Monitor shelter parts fabricated.
Part | Quan. | Designed? | Fabricated? |
---|---|---|---|
Vent connector mount | 1 | * | * |
Vent connector cover | 1 | * | * |
Vent mount | 2 | ||
PM box | 1 | * | * |
PM lid | 1 | * | * |
PM Baffle | 1 | * | * |
PM Screen mount | 2 | * | * |
PM Screen holder | 2 | * | * |
PM Inlet shroud | 1 | * | * |
PM box mount | 1 | ||
Vent/UV mount | 1 | ||
PM Cable assembly | 1 | (1) | |
UV Cable assembly | 1 |
(1) Likely will just reuse previous assembly
1.1. Next step
1.1.1. Order any needed supplies
Screws. Need to establish a better source of hardware as existing sources have finally dried up. I'm not paying $0.50 each for a #4x1/4" sheet metal screw.
1.1.2. Assemble and test
2. Swocer
2.1. Most crashing addressed
Nullified 'handle' API free functions helped a lot. Still see some errors in operations.
2.2. Added outline for 'bottle' test
Added all functions believed to be needed for 'bottle' demo test. Test doesn't pass so is disabled.
2.3. Next steps
Swocer future. Check out what's needed for gears.
3. Soap Molds
Investigating mold making for hand soaps (for Annie). Need to implement 'drafts' in swocer if I go that route.
4. ca-r
Tier data finally deprecated so processing is removed.
4.1. Next Step
None.
5. Linux Audio
5.1. CSound programming.
The FORTRAN of computer music. Getting up to speed.
5.2. Faust programming
5.2.1. Next Steps
- GAC Patch save/restore
- LV2 autopatcher
Exploratory tool to generate (was pd, ecasound, now carla) patch for arbitrary LV2 plugin: hook up audio inputs to signal source, audio outputs to speakers, control inputs to control surface, etc.
- OSC control surface
Some sort of GUI tool (knob/slider) to OSC messages. This may be as simple as a Faust UI program.
- Faust/csound
See if a faust generated unit works.
6. EPICS
6.1. Next steps
6.1.1. u3scpi network port testing
6.1.2. initial EPICS interface
6.1.3. u3scpi analog/digital port reconfiguration.
7. Brini Tracker II
Suspended for now.
7.1. Next steps
7.1.1. Validate remaining standard GPS messages
7.1.2. Investigate GPS chipset data logging
7.1.3. Investigate LoRA radio interface
8. wktcolor
8.1. Next steps
8.1.1. Explore how to get a minimal coloring
Need a specific planar graph four coloring.
9. wktplot
9.1. Next steps
Understand why -r doesn't solve the wktvor/wktdel "sliver at edge" problem. Explore biological cell Voronoi organization
10. AMDGPU
10.1. Next step
10.1.1. Reverse engineer HSAKMT programming.
11. Ninja v Make
11.1. Next Step
11.1.1. clean simple measurements
12. GMP Forth
Need to think about adding floating point support